505-402-4967

505-402-4967

  • Home
  • The Event Space
  • The Petite Hotel
  • Book AirBNB
  • Things to do in Aztec
  • The Idea
  • Restoration

Lifting the 2nd Floor of the Leanor 3" to make her level

The Beam and Poles in place

In this video, we lifted the top floor by placing a colossal 8X8' beam underneath it.  We got it there by jacking it up and then propping it up with telephone poles.

The Mechanisms used to lift the beam

By using two large winch supports and drilling a two holes in the floor, we ratcheted the beam downstairs up until it was flush with the ceiling, and then we propped the beam up with telephone poles.

Copyright © 2023 The Leanor - All Rights Reserved.

  • The Event Space
  • Rental Agreement
  • Book Event Space
  • The Petite Hotel
  • Book AirBNB
  • Things to do in Aztec

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept